SCH Number 2011081098


Project Info

Title
Mitsubishi Cement Facility Modification Project
Description
The Project consists of modifications to an existing cement import facility, including: installing an emission control system (DoCCS) to capture and reduce NOx emissions from ship auxiliary generators at berth; constructing four 10,000 metric ton storage and truck loading silos; upgrading existing facilities and ship unloading equipment; and modifying the operating permit issued by the South Coast Air Quality Management District for the facility. MCC Terminal, Inc. (MCC) proposes to construct the additional cement storage silos and truck loading equipment in a vacant adjacent area at 1120 Pier F Avenue that was formerly used as the warehouse for Pacific Banana operations. The current 4.21-acre site would be enlarged to 5.92 acres.
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
City of Long Beach MCC Cement Facility Modification Project - HDP #06-162
City of Long Beach MCC Cement Facility Modification Project - HDP #06-162
City of Long Beach Mitsubishi Cement Facility Modification Project
City of Long Beach Mitsubishi Cement Facility Modification Project
City of Long Beach Mitsubishi Cement Facility Modification Project