SCH Number 2011041053
Project Info
- Title
- 3000 E Imperial Highway Response Plan
- Description
- " Construction and operation of soil vapor extraction unit (SVE) " Limited excavation and off-site disposal of contaminated soil " Backfilling with clean soil " Project-related vehicle traffic on site The project consists of on-site remediation of soil vapor and soil impacted with VOCs and petroleum hydrocarbons. In addition, limited excavation lead-impacted solid at the Site. SVE with limited exaction and off-site disposal is considered to be a cost-effective treatment alternative capable of meeting the RAOs within a reasonable periods. Additionally, electrical resistive heating (ERH) may be utilized in a approximately 5,000 square foot area in the vicinity of the former USTs to optimize the efficiency of SVE in this area.
2 documents in project