- Independence Water Storage Reservoir Replacement Project
- Description
- The California Department of Public Health (CDPH) is responsible agency for this project. Inyo County PWD - independence constructed two new welded steel water storage reservoirs (East and West Tanks) between April and December2008. The East and West Tanks replaced the water system's original water storage reservoir which was destroyed during the Inyo Complex Fire on July 17, 2007. The reservoirs were put into operation at the end of December 2008. Each new reservoir is approximately 24 feet high by 48 feet in diameter and has a 200,000 gallon operating capacity/250,000 gallon maximum capacity. The reservoirs will connect to the existing water distribution system with approximately 450 linear feet of ductile iron pipe.