SCH Number 2010011062
Project Info
- Title
- Eastside Transit Corridor Phase 2 Project
- Description
- Note: Review Per Lead Notice of Preparation for a Supplemental/Recirculated Draft EIS/EIR for the Eastside Transit Corridor Phase 2 (project) in Los Angeles County, CA. The proposed project would extend the Metro Gold Line, a light rail transit (LRT) line, from its current terminus at Atlantic Station in the unincorporated area of East Los Angeles to eastern Los Angeles County. The four alternatives to be evaluated in the Supplemental/Recirculated Draft EIS/EIR include: No Build Alternative, SR 60 Alternative, Washington Alternative, and Combined Alternative. The Los Angeles County Metropolitan Transportation Authority (Metro) Board of Directors will consider adopting a Locally Preferred Alternative (LPA) based on the findings of the Supplemental/Recirculated Draft EIS/EIR.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOP | Los Angeles County Metropolitan Transportation Authority (LSCMTA) | Eastside Transit Corridor Phase 2 Project | |
EIR | Metropolitan Transportation Authority | Eastside Transit Corridor Phase 2 Project | |
NOP | Metropolitan Transportation Authority | Eastside Transit Corridor Phase 2 Project |