SCH Number 2009112025
Project Info
- Title
- Common Features/Natomas PACR/Natomas Levee Improvement Program, Phase 4b Project
- Description
- Approval of Permit No. 19189, under CA Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8: to install a new power pole on the left bank of Natomas Cross Canal for the relocation of an existing PG&E overhead power line; to remove three existing power poles in the left bank levee and backfill the resulting holes with controlled low strength material.
9 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Sacramento Area Flood Control Agency | Permit No. 19503 – Sacramento Municipal Utility District – Utility Poles | |
NOD | Sacramento Area Flood Control Agency | Pacific Gas & Electric Company Power Pole Relocation Project | |
NOD | Sacramento Area Flood Control Agency | Natomas Basin Project/Natomas Levee Improvement Program Phase 4b Landside Improvements Project | |
NOD | Sacramento Area Flood Control Agency | Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project | |
NOD | Sacramento Area Flood Control Agency | Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project | |
NOD | Sacramento Area Flood Control Agency | Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project | |
FIN | Sacramento Area Flood Control Agency | Common Features/Natomas PACR/Natomas Levee Improvement Program, Phase 4b Project | |
EIR | Sacramento Area Flood Control Agency | Common Features/Natomas PACR/Natomas Levee Improvement Program, Phase 4b Project | |
NOP | Sacramento Area Flood Control Agency | Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project |