SCH Number 2009092071
Project Info
- Title
- Berglund Family Vineyards Project
- Description
- The proposed project includes two petitions. A petition for extension of time was filed to extend the time for full beneficial use under Permit 17941 to the year of maximum water use (1995). A Petition for Change was also filed to add a point of diversion/rediversion at Low Reservoir, redistribute storage, and reduce the place of use. The Permittee reconfigured the reservoir design from a single reservoir to two reservoirs and has changed the crop type from pasture to vineyard.
2 documents in project