SCH Number 2009081092
Project Info
- Title
- El Cerrito Road Improvement Project
- Description
- The Redevelopment Agency's El Cerrito Road Improvement consists of storm drain improvements and street improvements of the existing segment of El Cerrito Road between I-15 and East Ontario Avenue/Temescal Canyon Road. The storm drain improvements include demolishing and removing ~2,140 linear ft of the existing box culvert and concrete-lined open-channel storm drain and constructing ~2,140 linear ft of buried reinforced concrete box culvert along the northerly side of El Cerrito Road. The Street improvements include extending the curb, gutter, and sidewalk along the north side of El Cerrito Road; constructing curb, gutter, and sidewalk along the south side of El Cerrito Road; constructing and landscaping a raised median; re-paving portions of El Cerrito Road; installing a traffic signal at the intersection of El Cerrito Road and Evelyn Street; and installing 10 street lights along El Cerrito Road.
2 documents in project