- Perris Boulevard Street Improvement Project
- Description
- The project includes widening portions of Perris Boulevard from Perris Valley Storm Drain Lateral "B" to Cactus Avenue to a consistent 6 lane roadway with 3 northbound and 3 southbound lanes with sidewalk, curb, and gutter. The current configuration varies from 3 to 6 travel lanes. The total width of the roadway would be 86 ft curb to curb within a 110 ft right-of-way. The total length of the project is 3.5 miles. Responsible agencies would include the U.S. Fish and Wildlife Service and the State of California-Department of Fish and Game.
2 documents in project