SCH Number 2009032081


Project Info

Title
Yuba Community College District Sutter Facility
Description
The proposed educational facilities would consist of classrooms and college facilities (~50,000 sf) and district administrative facilities (~30,000 sf) for a total of 80,000 sf of built facilities. YCCD estimates that ~77 staff (50 administrative and 27 teachers) would be employed at the new district offices. It is anticipated that the majority of the staff would be supplied by the local labor pool. The student population at the facility at any one time would be ~500 students in 18 classrooms. The facility would operate 7 am-10 pm on weekdays and 7 am- 6 pm on Saturdays. Access to the proposed project would be provided by 3 driveways along East Onstott Frontage Road. The project includes ~700 parking spaces. Implementation of the proposed project would require off-site water and wastewater pipeline construction. The nearest City of Yuba City wastewater system pipelines, located along Pease Road, are not designed to accept additional flow from outside of the city limits. Pipelines within Pease Road near the project site flow to a lift station located at Manchester Way and East Onstott Frontage Road. In addition to extension of and possible upsizing of sewer lines, the lift station would require expansion of pump upgrades top accommodate increased flow. These improvements would occur within existing paved rights of way.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Yuba Community College District Yuba Community College District Sutter Facility
Yuba Community College District Yuba Community College District Sutter Facility