SCH Number 2009022094
Project Info
- Title
- 114 7th Street Mixed-Use Project
- Description
- This project involves the installation of a removable river pump in the Calaveras River. The construction involves excavating ~24.66 cubic yards of soil and covering it with a 18.8 cubic yards rip-rap to protect the bank from winter erosions. Approximately 0.48 cubic yards of concrete will be used to place a 4'x4' concrete slab foundation on the river low flow access road to mount the removable river pump, removable hose, and self cleaning screen during irrigation season. A 12" irrigation outlet with a quick release will be placed on th eNorth river bank to connect the farmers existing irrigation line to the 12" removable hose and removable river pump.
3 documents in project