SCH Number 2008121014
Project Info
- Title
- Vista Del Rio Project
- Description
- The City of Los Angeles Bureau of Engineering is preparing a draft supplemental EIR. The project will include remediation, pedestrian pathways, interpretive signs, flexible event spaces, landscaping and parking. The project will also include soil remediation to accommodate the proposed uses. A parking area will be provided for the project on the existing lot located south of the property. Access will be provided via driveway connections along the southern access point of the Taylor Yard property.
7 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOP | City of Los Angeles | Vista Del Rio Project | |
NOD | City of Los Angeles | Los Angeles River Ecosystem Restoration Project Integrated Feasibility Report. | |
NOD | City of Los Angeles | Los Angeles River Ecosystem Restoration Project Integrated Feasibility Report. | |
NOD | City of Los Angeles | Los Angleles Ecosystem Restoration: Acquisition of Taylor Yard G2 Parcel | |
FIN | City of Los Angeles | Los Angeles River Ecosystem Restoration Study | |
EIR | City of Los Angeles | Los Angeles River Ecosystem Restoration Study | |
NOP | City of Los Angeles | Los Angeles River Ecosystem Restoration Feasibility Study, Los Angeles, California |