SCH Number 2008031094
Project Info
- Title
- Tunnel Stabilization & Sewer Pipeline Replacement Project
- Description
- The Project objective was to enlarge and fortify an existing tunnel to form a structural horseshoe shape and replace the sewer pipeline. In addition, a new sewer pipeline would be installed in the reconditioned tunnel with the older pipeline remaining in place. Additional addendums were adopted to realign a section of tunnel away from the coastal bluff for a distance of ~725 ft.
10 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
ADM | South Coast Water District | Tunnel Stabilization and Sewer Pipeline Replacement Project | |
NOD | South Coast Water District | Tunne Stabilization and Sewer Pipeline Replacement (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-7882-110 | |
ADM | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project | |
ADM | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project | |
ADM | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project | |
ADM | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project | |
NOD | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project | |
EIR | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project | |
EIR | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project | |
NOP | South Coast Water District | Beach Interceptor Sewer Tunnel and Pipeline Repair Project |