SCH Number 2007041052
Project Info
- Title
- South Coast Conduit/Upper Reach Reliability Project (Secondary Pipeline Project)
- Description
- The project would construct a second 48 inch water supply pipeline with appurtenant facilities from the South Portal of Tecolote Tunnel to the Corona Del Mar WTP to increase operational flexibility, reliability (ability to perform regularly scheduled inspections and maintenance to one pipeline while second is operational), and capacity to meet peak demands.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | United States Bureau of Reclamation (USBR) | South Coast Conduit/Upper Reach Reliability Project | |
EIR | United States Bureau of Reclamation (USBR) | South Coast Conduit/Upper Reach Reliability Project (Secondary Pipeline Project) | |
NOP | United States Bureau of Reclamation (USBR) | South Coast Conduit/Upper Reach Reliability Project (Secondary Pipeline Project) |