SCH Number 2007022116


Project Info

Title
Coliseum BART to Bay Trail Connector
Description
The project would consist of constructing an approximately one mile long trail connecting the Coliseum BART Station to the Bay Trail. The trail would start at the Coliseum BART station utilizing the existing BART/Coliseum walkway, would pass over the Amtrak Coliseum Station, and would cross above the railroad tracks (grade-separated). A pedestrian ramp would be constructed to link the elevated walkway to the maintenance road adjacent to Daemon Slough. The trail would then follow the Damon Slough on the maintenance road and would involve upgrading the gravel roadway surface to asphalt including installation of signs and pavement markings, and fencing. The trail would cross I-880 using the existing 66th Avenue freeway over-crossing, involving minor modifications to the existing sidewalk (increasing the width to 12 feet), narrowing the lane widths, and installation of a barrier between the sidewalk and the traffic lanes. This proposed facility would then link with the Bay Trail at the western end of 66th Avenue.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Alameda County Coliseum BART to Bay Trail Connector
Alameda County Coliseum BART to Bay Trail Connector