SCH Number 2006081005


Project Info

Title
Renewal of Waste Discharge Requirements (WDRs) for Injection of Treated Groundwater
Description
The project consists of the renewal of Waste Discharge Requirements (WDRs) regulating the injection of treated water from existing groundwater treatment facilities and injection system. The pump and treat system currently in operation is used to treat groundwater contaminated with hexavalent chromium (Chromium VI). The groundwater treatment facilities and injection system are owned and operated by PG&E, and are located approximately 15 miles southeast of Needles, CA, near the PG&E Control Board (Regional Board) would allow for the continued injection of treated water during operation of the groundwater treatment facilities would be constructed or expanded and no change to the existing groundwater treatment facility operations would occur as a result of renewal of the WDRs.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert Renewal of Waste Discharge Requirements (WDRs) for Injection of Treated Groundwater
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert Renewal of Waste Discharge Requirements (WDRs) for Injection of Treated Groundwater