- The landslide remediation project involves the repair and stabilization of the seven acre landslide area. Repairs include vegetation removal, demolition of damaged homes, streets and utilities, a temporary shoring wall along the toe of the landslide area, installation of a 72" storm drain that connects to two existing storm drains, replacement of water and sewer lines, slope winterization, stabilization of the landslide headscarp area supporting Madison Place and Flamingo Road cul-de-sac (construction of a caisson wall and grade beam/tieback system), grading (excavation and compaction of approximately 600,000 cubic yards of disturbed material), construction of retaining walls, replacement of Flamingo Road and all associated utilities (curb, gutter, water/sewer lines, electrical, phone and cable) and surface drainage facilities (v-ditches, down drains and terrace drains).