SCH Number 2005122101
Project Info
- Title
- Recirculation of Tidewater Crossing Master Development Plan Project
- Description
- The project includes excavating approximately 10 cubic yards of soil from the dry bed of the stream channel, and excavated 10 cubic yards of rock slope protection into the stream channel. An additional 68 cubic yards of soil will be excavated from the banks of the stream channel above the ordinary high-water mark, and 68 cubic yards of rock slope protection will be placed along the banks of the stream channel above the OHWM. Above the rock slope protection and OHWM, a 24-inch diameter outfall will be installed in the upper bank of the stream channel for conveying storm water flows from the detention basin pump station of the adjacent property
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Stockton | Permit No. 19380: Tidewater Crossing Outfall Project | |
NOD | City of Stockton | Tidewater Crossing Outfall project | |
EIR | City of Stockton | Recirculation of Tidewater Crossing Master Development Plan Project | |
EIR | City of Stockton | Tidewater Crossing Master Development Plan Project | |
NOP | City of Stockton | Tidewater Crossing Master Development Plan Project |