SCH Number 2005112095
Project Info
- Title
- Restoration of Santa Rosa Creek - Pierson Reach
- Description
- The project consists of removing grouted concrete from the existing channelized waterway and reconfiguring the channel and banks to create a more natural channel. The reconfigured creek will contain a low-flow channel and features such as pools, riffles, and meanders, as feasible.
2 documents in project