- Montgomery High School Field Lights Project
- Description
- The project would add four 80-foot poles with 12 lights each to the existing football and track field. The four poles would be installed symmerically 165 feet apart and 65 feet from the track. Construction would be completed over a three to four week period. The lights are scheduled to be in place by the fall of 2006.