- Water Supply and Wastewater Master Plans
- Description
- Use of the proposed primary effluent disposal sites would require construction of pipelines, storage ponds, and return pump stations. Pipelines would deliver effluent from the wastewater treatment plant to the proposed treated effluent storage reservoirs. Two pipelines would convey the effluent from the treated effluent storage reservoirs under Outside Canal and distribute the effluent to the northern and southern disposal areas. A tailwater pond and pump station would be constructed in the northeastern corner of the northern and southern disposal areas to collect excess treated effluent that drains from the site and return it to the storage reservoirs. Tailwater collection ditches would be located along the northern and eastern boundaries of each disposal area. Tailwater return pipelines would be located along the eastern border of the northern disposal area and the northern border of the southern disposal area.