SCH Number 2004011105
Project Info
- Title
- Marin Del Rey Water Quality Improvement Project
- Description
- The proposed project is a two-part approach aimed at addressing chronic bacterial contamination at Marina Beach. Part 1 of the project involves redirecting local storm water run off from Basin D (where contact recreation is allowed) into Basins C and E (where the water is not used for contact recreation), with the goal of reducing at Basin D. Part 2 involves the installation of water circulators within Basin D, which should reduce high concentrations of pollutants.
2 documents in project