SCH Number 2003019001
Project Info
- Title
- Chino Groundwater Basin Dry-Year Program
- Description
- The project consists of the permitting and operation of the Northwest "B" IX Facility and Well 31 located within the Chino Groundwater Basin. The Northwest "B" IX Facility will treat water with high nitrate levels from a well shared by the City of Chino and the Monte Vista Water District. Well 31 is one of six new wells proposed in the Chino Groundwater Basin Dry-Year Yield program. Well 31 produces 1,500 gpm and will be connected to an existing 12-inch diameter distribution line along Richton Street.
4 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Inland Empire Utility Agency | Permitting and Operation of Northwest "B" IX facility and Well 31; Public Water System No. 3610029 | |
NOD | Inland Empire Utility Agency | Permitting and Operation of Northwest "B" IX facility and Well 31; Public Water System No. 3610029 | |
NOD | Inland Empire Utility Agency | Chino Basin Groundwater Storage/Metropolitan Dry-Year Yield Program | |
NOD | Inland Empire Utility Agency | Chino Groundwater Basin Dry-Year Program |