SCH Number 2002091046


Project Info

Title
Chamois Production Well Project
Description
The proposed project consists of development and production of a vertical well using the existing well casing within the community of Crestline. a submersible pump with a 10 (+/-) horsepower submersible electric motor, power cable, and discharge piping will be installed within the well casing. A small segment (approximately 50 linear feet) of pipe is needed to connect the well to the existing water main and a small protective structure will be built on top of the reinforced concrete slab surrounding the well casing in the center of the graded well pad. The new facilities will augment water supply for existing and future development consistent with the CVWD's Urban Water Management Plan and the San Bernardino County General Plan.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Crestline Village Water District Chamois Production Well Project
Crestline Village Water District Chamois Production Well Project