SCH Number 2002022010


Project Info

Title
Concord to Sacramento Petroleum Products Pipeline
Description
Line Section 130 AC Mitigation Project is a maintenance project on a 20-inch diameter petroleum pipeline running between Concord and Sacramento. An Alternating Current (AC) Mitigation System, consisting of an encased copper cable and grounding rods, will be installed primarily in a 6-inch trench alongside the pipeline. In areas with surface waters, horizontal directional drilling will be used to install the cable.
Download CSV New Search

 

6 documents in project

Type Lead/Public Agency Received Title
California State Lands Commission Line Section 130 AC Mitigation Project
California State Lands Commission Concord to Sacramento Pipeline Project
California State Lands Commission Amendment to Master Lease and Issuance of a New General Lease - Right of Way Use
California State Lands Commission Concord to Sacramento Petroleum Products Pipeline
California State Lands Commission Concord to Sacramento Petroleum Products Pipeline
California State Lands Commission Concord to Sacramento Petroleum Products Pipeline