SCH Number 2002022010
Project Info
- Title
- Concord to Sacramento Petroleum Products Pipeline
- Description
- Line Section 130 AC Mitigation Project is a maintenance project on a 20-inch diameter petroleum pipeline running between Concord and Sacramento. An Alternating Current (AC) Mitigation System, consisting of an encased copper cable and grounding rods, will be installed primarily in a 6-inch trench alongside the pipeline. In areas with surface waters, horizontal directional drilling will be used to install the cable.
6 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | California State Lands Commission | Line Section 130 AC Mitigation Project | |
NOD | California State Lands Commission | Concord to Sacramento Pipeline Project | |
NOD | California State Lands Commission | Amendment to Master Lease and Issuance of a New General Lease - Right of Way Use | |
FIN | California State Lands Commission | Concord to Sacramento Petroleum Products Pipeline | |
EIR | California State Lands Commission | Concord to Sacramento Petroleum Products Pipeline | |
NOP | California State Lands Commission | Concord to Sacramento Petroleum Products Pipeline |