SCH Number 2001021085
Project Info
- Title
- El Rio Sewer System Project
- Description
- The Project will help reduce nitrate contamination of the area groundwater by converting a residential and industrial area from a septic sewage system to a collection/central treatment sewage system. The Project will involve: 1) constructing ~1,400 linear ft of trench stabilization, ~28,500 linear ft of 8 inch diameter sewer pipeline, ~100 manholes, and necessary connections and clean-outs within the public right-of-way; and 2) conducting necessary site preparation, access, traffic control and security improvements. The completed sewer collection system will transport sewage from the collection system to City of Oxnard wastewater treatment plant for treatment and disposal.
7 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | United States Environmental Protection Agency (EPA) | El Rio Sewer System Project, phases 5B05D (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-4680-120 | |
NOD | United States Environmental Protection Agency (EPA) | El Rio Sewer System Project Phases V and VI; State Revolving Fund Load No. C-06-4680-110 | |
NOD | United States Environmental Protection Agency (EPA) | El Rio Sewer System Project Phases V and VI; State Revolving Fund Load No. C-06-4680-110 | |
NOD | United States Environmental Protection Agency (EPA) | El Rio Sewer System Project Phases V and VI; State Revolving Fund Load No. C-06-4680-110 | |
JD | United States Environmental Protection Agency (EPA) | El Rio Sewer System Project | |
NOD | United States Environmental Protection Agency (EPA) | El Rio Sewer System Project | |
NEG | United States Environmental Protection Agency (EPA) | El Rio Sewer System Project |