SCH Number 2000071006
Project Info
- Title
- UCSD Cancer Center, Medical Center Drive Realignment, and East Campus Utilities Plant
- Description
- The East Campus Utilities Plant (ECUP) would centralize chilled water and emergency power for non-hospital uses in the East Campus Health Sciences (ECHS) neighborhood. The initial construction is designed to accommodate the chilled water and emergency energy demands of the existing Ratner Eye Center, the existing Shiley Eye Center (and a potential building expansion at Shiley Eye Center), as well as the proposed UCSD Cancer Center. Initial construction would increase a 6, 750-square-foot single-story, high bay central plant building as well as two 900- ton electric-driven centifugal chillers, condensed and chilled water pumps, cooling towers, a 12 k V electrical substation, two 1, 000 W/1, 250k V a diesel engine-driven generators, and two 10, 000-gallon underground fuel tanks. At buildout, the ECUP would house a total of five chillers and four generators.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | University of California San Diego | East Campus Utilities Plant, Medical Center Drive Realignment and Surface Parking | |
NOD | University of California San Diego | UCSD Cancer Center, Medical Center Drive Realignment, and East Campus Utilities Plant | |
NEG | University of California San Diego | UCSD Cancer Center, Medical Center Drive Realignment, and East Campus Utilities Plant |