SCH Number 2000052113


Project Info

Title
Initial Study/Mitigated Negative Declaration for the Century Boulevard Storm Drain Relocation Project
Description
Relocation of an existing storm drain system serving the Century Plaza development, located between State Route 4 and the Pittsburg-Antioch Highway. The proposed project includes the decommissioning of existing storm drain pipes, catch basins, and outfall to Los Medanos Wasteway and installation of new storm drain pipes and catch basins with and outfall to the Dow Channel.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Pittsburg Century Boulevard Storm Drain Relocation
City of Pittsburg Initial Study/Mitigated Negative Declaration for the Century Boulevard Storm Drain Relocation Project