SCH Number 2000022029


Project Info

Title
Flood Control Improvements Along the Mainstem of the American River
Description
The project involves modifications to Folsom Dam and levees along the lower American River. The elements of the project include reoperating Folsom Dam on a long-term basis, modifying Folsom Dam's outlet works, equalizing levee heights along the lower American River, constructing a closure structure at the mouth of the Mayhew Drain and a pumping facility as appropriate, to prevent the backup of floodwaters on the Folsom Boulevad side of the closure structure, and increasing the conveyance capacity of the South Sacramento Streams Group levee system.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Sacramento Area Flood Control Agency Flood Control Improvements Along the Mainstem of the American River
Sacramento Area Flood Control Agency Flood Control Improvements Along the Mainstem of the American River
Sacramento Area Flood Control Agency Flood Control Improvements Along the Mainstem of the American River