SCH Number 1999111074
Project Info
- Title
- State Route 5/14 Interchange HOV Widening Project
- Description
- This proposed project involves the Permittee proposes permanently to re-align a stretch of Wheldon Creek into a 3.05- meter (10 feet) wide by 2.44- meter (8 feet) deep excavated trapezoidal channel. The 10-foot width is at the bottom of the trapezoidal channel and the slope has a 1 to 1 1/2 slope and is 8 feet high. The channel will be 10 meters (33 feet) wide at the top of the slope. The new portion of the creek will be 587 meters (190 feet) long with a 1.8- meter (6 feet) deep Rock Slope Protection (RSP) from top of slope to top of slope. Approximately 1300 and 2000 cubic yards of RSP will be placed (0.15 acre).
6 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | California Department of Transportation, District 7 | Interstate 5/State Route 14 High Occupancy Vehicle (HOV) Connector Project | |
NOD | California Department of Transportation, District 7 | Interstate 5/State Route 14 High Occupancy Vehicle (HOV) Connector Project | |
NOD | California Department of Transportation, District 7 | Interstate 5/State Route 14 High Occupancy Vehicle (HOV) Connector Project | |
NOD | California Department of Transportation, District 7 | HOV Connector from Interstate Route 5 to State Route 14 | |
NEG | California Department of Transportation, District 7 | State Route 5/14 Interchange HOV Widening Project | |
CON | California Department of Transportation, District 7 | HOV Connector from Interstate Route 5 to State Route 14 |