SCH Number 1999091067
Project Info
- Title
- Miramar Water Treatment Plant Upgrade and Expansion
- Description
- The City proposed Project will replace the previously existing concrete rectangular semi-buried Clearwell-2 and its associated pipelines and appurtenances. The Project construction area is 6.5 acres within the MWTP property immediately south of Miramar Lake and within the Scripps Miramar Ranch Community Plan area. The previously existing Clearwell-2 has been removed and at 1.95 MG, it was of greater capacity than the proposed facility. The new Clearwell-2 and the overall project will serve both current and project populations. The proposed new 29.5-MG Clearwell-2 reinforced concrete storage facility will be constructed with 391' x 420' dimensions and at approx. 26-28' depth with hopper bottoms and a 1V:3H slope. Approximately 75% of the project site will be graded within a 712-720 ft elevation range to slope away from the clearwells and buildings in all directions. Staging for the project will be located within the MWTP property fence line. Land adjacent to the project site includes Miramar Lake recreation Area to the north, Scripps Ranch Library and Miramar Ranch Elementary School to the south, and commercial, industrial and residential areas to the west.
9 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of San Diego | Operation of City of San Diego - Clearwell No. 1 at Miramar Water Treatment Plant (MWTP) Project (Project) | |
NOD | City of San Diego | Operation of City of San Diego - Chlorine Contact Chamber addition to Miramar Water Treatment Plant Project (Project) | |
NOD | City of San Diego | Operation of City of San Diego - Decommission and replace Clearwell No. 2 at Miramar Water Treatment Plant Project | |
NOD | City of San Diego | Miramar WAter Treatment Plant Upgrade and Expansion | |
NOD | City of San Diego | Advertising for Bids for Miramar Water Treatment Plant Early Start Improvements Project Phase II | |
NOD | City of San Diego | Advertising for Bids for Miramar Water Treatment Plant Early Start Improvements Project Phase II | |
NOD | City of San Diego | Miramar Water Treatment Plant Upgrade and Expansion | |
EIR | City of San Diego | Miramar Water Treatment Plant Upgrade and Expansion | |
NOP | City of San Diego | Miramar Water Treatment Plant Upgrade and Expansion |