SCH Number 1998041022


Project Info

Title
Pier S Marine Terminal and Back Improvements
Description
Note: FEIS/FEIR The Port of Long Beach is proposing the development of Pier S Marine Terminal and Back Channel Improvements Project. The development of Pier S and Back Channel improvements would result in an approximately 160-acre marine container terminal, and would include the following elements: property acquisition; dredging, wharf construction, other waterside improvements, and container cranes; container yard and associated structures; terminal buildings and other structures; truck gates, associated structures, and roadwork; intermodal rail yard, structures, and dual rail lead; and utility and oil facility relocation.
Download CSV New Search

 

10 documents in project

Type Lead/Public Agency Received Title
Port of Long Beach Pier S Marine Terminal
Port of Long Beach Pier S Marine Terminal
Port of Long Beach Pier S Marine Terminal
Port of Long Beach Pier S Marine Terminal and Back Improvements
Port of Long Beach Modification to Pier S Terminal Project (Widening for Safety Purposes)
Port of Long Beach Pier S Marine Terminal
Port of Long Beach Pier S Marine Terminal Project
Port of Long Beach Pier S Marine Terminal Project
Port of Long Beach Pier S Marine Terminal Project
Port of Long Beach Pier S Marine Terminal Project