SCH Number 1998041022
Project Info
- Title
- Pier S Marine Terminal and Back Improvements
- Description
- Note: FEIS/FEIR The Port of Long Beach is proposing the development of Pier S Marine Terminal and Back Channel Improvements Project. The development of Pier S and Back Channel improvements would result in an approximately 160-acre marine container terminal, and would include the following elements: property acquisition; dredging, wharf construction, other waterside improvements, and container cranes; container yard and associated structures; terminal buildings and other structures; truck gates, associated structures, and roadwork; intermodal rail yard, structures, and dual rail lead; and utility and oil facility relocation.
10 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
FIN | Port of Long Beach | Pier S Marine Terminal | |
JD | Port of Long Beach | Pier S Marine Terminal | |
NOP | Port of Long Beach | Pier S Marine Terminal | |
NOP | Port of Long Beach | Pier S Marine Terminal and Back Improvements | |
NOD | Port of Long Beach | Modification to Pier S Terminal Project (Widening for Safety Purposes) | |
NOP | Port of Long Beach | Pier S Marine Terminal | |
NOD | Port of Long Beach | Pier S Marine Terminal Project | |
RIR | Port of Long Beach | Pier S Marine Terminal Project | |
EIR | Port of Long Beach | Pier S Marine Terminal Project | |
NOP | Port of Long Beach | Pier S Marine Terminal Project |