SCH Number 1997052029
Project Info
- Title
- Baily Road Bridge Replacement
- Description
- The project calls for the replacement of a deteriorating two lane bridge with a new bridge 32 feet wide by 40 feet long. New abutments will be constructed outside the creek banks (the exisiting abutments will remain). During construction a temporary crossing will be built approximately 16 feet downstream. Provisions are included to minimize any impacts on red legged frog and California tiger salamander which may be present in the vicinity.
2 documents in project