SCH Number 1988092105
Project Info
- Title
- EAST MISSION GORGE INTERCEPTOR CIP #43-104(EQD 88-0089)
- Description
- CONSTRUCTION OF A SEWAGE PUMP STATION AND A 48-INCH DIAMETER WASTEWATER FORCE MAIN PIPELINE, EXTENDING APPROXIMATELY 42,000 FEET FROM SANTEE TO THE EASTERN END OF MISSION VALLEY. THE PROPOSED PROJECT WOULD PROVIDE HYDRAULIC RELIEF FOR THE EXISTING EAST MISSION GEORGE INTERCEPTOR SEWER, WHICH IS NEAR ITS SEWAGE TRANSPORT CAPACITY.
2 documents in project