SCH Number 1983010511
Project Info
- Title
- OCEANSIDE EXPERIMENTAL SAND BYPASS SYSTEM
- Description
- ACTION CONSISTS OF THE INSTALLATION AND OPERATION OF AN EXPERIMENTAL SAND BYPASS SYSTEM WHICH WOULD PREVENT OR MINIMIZE THE FILLING OF OCEANSIDE WOULD MAINTAIN THE NECESSARY CHANNEL DEPTH BY COLLECTING AND PUMPING APPROX. 400,000 CU. YDS. P/YR. FROM THE HARBOR TO DISCHARGE POINTS DOWNCOAST ON O
2 documents in project