SCH Number 1982092310


Project Info

Title
State Route 710 North Project
Description
Note: Per lead agency, the FEIR/FEIS may also be viewed at the following link on the Caltrans website: http://www.dot.ca.gov/d7/env-docs/docs/SR710NorthProject/ . Caltrans, in cooperation with the Los Angeles County Metropolitan Transportation Authority, is proposing to implement transportation improvements to improve mobility and relieve congestion on SR 710 between SR 2 and I-5, 10, 210, and I-605, respectively) in east / northeast Los Angeles and the western San Gabriel Valley. The study area for the SR 710 North Study is approximately 100 square miles and generally bounded by I-210 on the north, I-605 on the east, I-10 on the south, and I-5 and SR 2 on the west. The proposed alternatives include: the Transportation System Management/Transportation Demand Management (TSM/TDM) Alternative, Bus Rapid Transit Alternative, Light Rail Transit, and Freeway Tunnel.
Download CSV New Search

 

10 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 7 Construction of 6.2 Miles of the Long Beach Fwy (SR 710)
California Department of Transportation, District 7 SR-710 North Project
California Department of Transportation, District 7 Construction of 6.2 Miles of the Long Beach Fwy (SR 710)
California Department of Transportation, District 7 Construction of 6.2 Miles of the Long Beach Fwy (SR 710)
California Department of Transportation, District 7 SR 710 North Study
California Department of Transportation, District 7 Interstate 710 North Gap Closure
California Department of Transportation, District 7 Construction of 6.2 Miles of the Long Beach Fwy (SR 710)
California Department of Transportation, District 7 State Route 710 North Project
California Department of Transportation, District 7 State Route 710 North Project
California Department of Transportation, District 7 State Route 710 North Project