BNSF Ono Lead Track Extension Project
Summary
SCH Number
2021030193
Lead Agency
City of San Bernardino
Document Title
BNSF Ono Lead Track Extension Project
Document Type
EIR - Draft EIR
Received
Document Description
The Project proposes to install a fourth lead track extending the existing A Yard lead track to two existing Ono Storage Sidings. A continuous lead track would be created, closing the existing gap between the Ono Storage Sidings and improving the flow of trains in and out of the A Yard. The Project does not propose to increase rail line operations; instead it would improve the A Yard’s operational efficiency by improving the A Yard’s ability to assemble and hold outbound trains, as well as move around railroad cars without obstructing mainline movements, reducing train congestion along the existing lead tracks and reducing train idling by approximately 43 percent. The approximately 41-acre Project site consists of the existing BNSF corridor and adjacent properties where ground disturbances (including temporary construction staging) and/or property acquisitions would occur. The proposed fourth lead track would be constructed within/along approximately 4.3 miles of the existing BNSF corridor generally from BNSF corridor generally from the BNSF overpass at State Street/University Parkway on the north to the existing SBD Intermodal. To accommodate the proposed improvements, the Project would require circulation and roadway improvements/modifications to City roadways
Contact Information
Name
Rita Garcia
Agency Name
Project Manager
Contact Types
Consulting Firm
Phone
Name
Oliver Mujica
Agency Name
Planning Division Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
San Bernardino
Counties
San Bernardino
Zip
92401
State Highways
I-215
Railways
BNSF Corridor
Other Location Info
The Project site is comprised of two dis-contiguous segments (i.e., northern and
southern) which extend approximately 4.3 linear miles along the BNSF corridor adjacent to/west of Interstate 215 (“I-215”).
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Transportation, District 8 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Transportation:Rail
Local Actions
EIR Certification, Encroachmet Permits, Demolition Permits
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Wetland/Riparian