New Outdoor Pool Facility and South of Campus Improvement Project Notice of Determination

2 Documents in Project

Summary

SCH Number
2020109010
Lead Agency
La Cañada Flintridge Unified School District (LCUSD)
Document Title
New Outdoor Pool Facility and South of Campus Improvement Project Notice of Determination
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2020
Present Land Use
Public
Document Description
The proposed project would demolish the existing basketball courts to construct a 40-meter pool facility with a 1,176-square-foot pool equipment area, 1,620-square-foot outdoor pool storage area, 218-square-foot girls restroom, 218-square-foot boys restroom, two 378-square-foot locker rooms, a 284-square-foot indoor concrete storage area, a 411-square-foot office, and 19 outdoor showers. The existing on-campus baseball field would be shifted west to expand the student parking lot, and the existing 25-meter pool and 750-square-foot pool equipment building would be replaced with new basketball courts with associated steps/seating that would provide extended emergency vehicle access to this area of campus. In addition, a drywell infiltration system would be constructed at the southern portion of the south parking lot to allow water to infiltrate the soil.

Contact Information

Name
Mark Evans, Associate Superintendent
Agency Name
La Cañada Unified School District
Contact Types
Lead/Public Agency

Name
Agency Name
La Cañada Unified School District
Contact Types
Project Applicant

Location

Cities
la canada flintridge
Cross Streets
Oak Grove Drive and Berkshire Place
Zip
91011
Total Acres
3.59
Parcel #
5823-001-901

Notice of Determination

Approving Agency
La Cañada Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes