Document Description
Cornerstone Development Group, Inc. (Developer), is proposing to subdivide ±52 acres (gross) into 80 lots in order to construct single-family dwelling units and associated accessory structures. A Preliminary Grading Plan is included. Parcel sizes would range from 6,000 square feet (SF) to 16,252 SF. The 2.7-acre parcel on the north side of Pine Grove Avenue is not proposed for development at this time and is identified as a designated remainder. The net acreage of the development site (excluding the remainder parcel, road rights-of-way [ROW], easements, and steep slopes) is 35 acres; thus, the net density of the project is 2.3 dwelling units per acre. The project is proposed to be constructed in three phases. It is estimated that installation of utilities, paving of on-site streets, and development of building pads would occur over a three- to four-month period for each phase. The timeframe for home construction would depend on market demands. The project includes a General Plan amendment from IL to Suburban Residential (SR) for the lands shown and detailed in the Initial Study. ±2.11 acres are public road and utility ROW that is within the boundaries. The project also includes a rezone of the project site. Because the remainder parcel on the north side of Pine Grove Avenue is not proposed for development, it is not included in the rezone. The current zoning designations are One-Family Residential 12,000 Square Foot Minimum Lot Size and Unclassified. The City has determined that the project site will be rezoned to Planned Development (PD) in accordance with City of Shasta Lake Municipal Code Chapter 17.62. The main access to the subdivision would be from Pine Grove Avenue. Chaucer Way in the northern end of Phase 2 of the Windsor Estates Subdivision would be extended to Pine Grove Avenue and would be constructed in accordance with City standards for a residential collector street (60-foot ROW, with two 18-foot driving lanes, and curbs, gutters, and sidewalks on both sides of the street). The remainder of the streets in the subdivision would be constructed as residential local streets (56-foot ROW, with two 16-foot driving lanes, and curbs, gutters, and sidewalks on both sides of the streets). Where required, a sound wall along Pine Grove Avenue would be constructed to ensure compliance with the City’s noise standards. The existing separated sidewalk along Pine Grove Avenue, west of the project site, would be extended along the property’s frontage. Landscaping, including street trees, would be planted adjacent to the sidewalk in accordance with City requirements. Utility infrastructure (water, sewer, electric, natural gas, and telephone) would be extended to the project site from Pine Grove Avenue and/or the existing terminus of Chaucer Way. Two detention basins would be provided to control runoff during storm events Construction activities would include clearing, grading, excavation, trenching, underground utility installation, road paving and striping, and construction of dwelling units. It is anticipated that all work associated with initial site work, installation of utilities, construction of streets, and development of building pads, would be conducted using conventional construction equipment (e.g., excavators, scrapers, graders, dozers, backhoes, forklifts, cranes, paving equipment, etc.). Construction of dwelling units would occur using conventional construction methods. Staging for construction equipment and materials would occur on the project site.

Contact Information

Name
Peter Bird
Agency Name
City of Shasta Lake
Contact Types
Lead/Public Agency

Name
Agency Name
Cornerstone Development Group
Contact Types
Project Applicant

Location

Cities
Shasta Lake
Counties
Shasta
Regions
Citywide, Countywide, Northern California
Cross Streets
Pine Grove Avenue Coeur D'Alene Avenue
Zip
96019
Total Acres
52
Parcel #
075-010-030, 029, 014
State Highways
151, Interstate 5
Railways
SP
Airports
NA
Schools
Gateway Unified School District
Waterways
Sacramento River, Churn Creek
Township
32N
Range
4W
Section
6
Base
MDM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 2 (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, Department of Toxic Substances Control, California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW)
State Reviewing Agency Comments
Department of Toxic Substances Control, California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW)
Development Types
Residential (Single-Family Subdivision)(Units 80, Acres 52)
Local Actions
General Plan Amendment, Planned Unit Development, Rezone, Land Division (Subdivision, etc.)
Project Issues
Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Transportation, Tribal Cultural Resources, Wildlife
Download CSV New Search Print