Kalamazoo Substation Unit 2 Switchgear Replacement Project

Summary

SCH Number
2020070104
Public Agency
Sacramento Municipal Utility District
Document Title
Kalamazoo Substation Unit 2 Switchgear Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/6/2020
Document Description
The Kalamazoo Substation Unit 2 Switchgear Replacement Project (Project) consists of replacing an aging 12-kilovolt (kV) switchgear unit that is in the northeast quadrant of the substation site. The new switchgear will be placed in the same location. Surface excavation will be required for the removal and construction of a new switchgear concrete foundation pad . A battery system containing 48-volt batteries within a covered enclosure to power the switchgear relays will be placed to the west of the new switchgear unit. The Project will also include modification and/or replacement of support infrastructure (i.e. conduit, telecom, etc.).

Contact Information

Name
Jerry Park
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency

Name
Agency Name
SMUD
Contact Types
Project Applicant

Location

Cities
Citrus Heights
Counties
Sacramento
Cross Streets
7436 Kalamazoo Drive
Parcel #
233-0081-005

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 21080(b)(9), 21084; Sections 15301 (Existing Facilties) and 15302 (Replacement or Reconstruction)
Reasons for Exemption
SMUD has reviewed and determined that the Project is categorically exempt from the provisions of CEQA pursuant to Sections 15301 (Existing Facilities) and 15302 (Replacement and Reconstruction). Section 15301 applies to projects that consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alternations of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. Section 15302 states that "Class 2 consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced ... " Thus, the Project will involve the repair and minor alternation of an existing substation facility resulting in no change or expansion of use; and the replacement of an existing switchgear unit in the same location and serving the same purpose and capacity. Therefore, no further environmental review is required.