PG&E Pipeline Maintenance Projects

3 Documents in Project

Summary

SCH Number
2020059035
Lead Agency
Humboldt Bay Harbor
Document Title
PG&E Pipeline Maintenance Projects
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2020
Present Land Use
Various
Document Description
The Project objectives are maintenance of three pipeline areas by either permanently decommissioning and replacing previously retired pipelines and/or reducing pipeline exposure due to erosion; thereby improving the operating condition and safety of the system in each area. PG&E intends to decommission the previously retired 8-inch diameter Line 137B Freshwater Slough crossing under the slough bed (R-354), replace and decommission the existing 4-inch diameter Line 137C (L-137C) Ryan Slough crossing that is currently exposed in the slough bed (R-519), and to remediate the erosion issues resulting from water flowing across an earth berm that runs along the west side of Ryan Creek (RT-102).

Contact Information

Name
Adam Wagschal
Agency Name
Humboldt Bay Harbor District
Contact Types
Lead/Public Agency

Name
Agency Name
PG&E
Contact Types
Project Applicant

Location

Counties
Humboldt
Cross Streets
Multiple
Zip
95501
Parcel #
017-121-005, 017-151-007, 017-031-005
State Highways
101
Airports
Murray Field
Waterways
Ryan Slough, Eureka Slough, Humboldt Bay
Township
5N
Range
1E
Section
30
Base
HM

Notice of Determination

Approving Agency
Humboldt Bay Harbor District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes