Streambed Alteration Agreement No. 1600-2015-0065-R1; Timber Harvesting Plan (THP), 2-15-003-SHA

Summary

SCH Number
2020050353
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2015-0065-R1; Timber Harvesting Plan (THP), 2-15-003-SHA
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2020
Document Description
The project is limited to six (6) encroachments including the diversion of water at an existing water drafting site; development of a water drafting site and rocked pad, and diversion of water; construction of a rock-armored ford with an 8-foot x 20-foot metal plate running surface; temporary installation of a vented culvert crossing; temporary installation of a log-filled crossing; and temporary installation of a skid crossing at an existing skid trail crossing.

Contact Information

Name
Harvest Vieira
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
California Forestry and Fire Protection
Contact Types
Project Applicant

Location

Counties
Trinity
Other Location Info
The project is located on an Unnamed tributary to Browns Creek in the Chanchelulla planning watershed (1106.310105) and Unnamed tributaries to Middle Fork Cottonwood Creek in the Harrison Gulch planning watershed (5524.360301) and Knob Gulch planning watershed (5524.360402); in the County of Trinity, State of California; Township 30N, Range 10W, Sections 22, 34, and 35; Mount Diablo Baseline and Meridian; USGS 7.5-minute quadrangle, Chanchelulla Peak.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No