10049 Bond Road Project
Summary
SCH Number
2020050334
Public Agency
City of Elk Grove
Document Title
10049 Bond Road Project
Document Type
NOE - Notice of Exemption
Received
Posted
5/14/2020
Document Description
The Project consists of a Rezone to amend the zoning designation of ±10 gross acres from the AR-5 (Agricultural Residential-Minimum 5-acre lot) designation to the AR-2 (Agricultural Residential-Minimum 2-acre lot) designation, and a Tentative Parcel Map to divide two existing parcels into the following new parcels: Parcel 1 (±2.0 acres); Parcel 2 (±2.0 acres); Parcel 3 (±2.0 acres); Parcel 4 (±2.0 acres); and a remainder Parcel (±2.0 acres). Any new home construction resulting from the Project will be required to comply with the City's Climate Action Plan (CAP) measures for new singlefamily construction including: BE-4. Building Stock: Encourage or Require Green Building Practices in New Construction, BE-5. Building Stock: Phase in Zero Net Energy Standards in New Construction, TACM-8. Tier 4 Final Construction Equipment TACM-9. EV Charging Requirements.
Contact Information
Name
Antonio Ablog
Agency Name
City of Elk Grove
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
JTS Engineering Consultants, Inc.
Contact Types
Project Applicant
Location
Cities
Elk Grove
Counties
Sacramento
Cross Streets
10049 Bond Road
Parcel #
127-0070-035 and -036
Notice of Exemption
Exempt Status
Other
Type, Section or Code
Consistent With a Community Plan or Zoning [Section 15183(a)]
Reasons for Exemption
CEQA requires analysis of agency approvals of discretionary "projects." A "project," under CEQA, is defined as "the whole of an action, which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment" (State CEQA Guidelines Section 15378). The proposed Project is a project under CEQA. State CEQA Guidelines Section 15183, provides that projects which are consistent with the development density established by a Community Plan, General Plan, or Zoning for which an environmental impact report (EIR) has been certified "shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant effects which are peculiar to the project or its site." An EIR was prepared and certified by the City Council as part of the Elk Grove General Plan (SCH# 2017062058). The proposed Project is consistent with the development density established by the General Plan EIR as the Tentative Parcel Map (TPM) will result in four new parcels and a remainder lot, each totaling two acres in size at a density consistent with the rural area range of 0.1 to 0.5 units per acre. While there is no physical construction proposed with this Project, buildout consistent with the EGMC and the proposed rezone would likely result in the development of four, new single-family residential units on the Project site. New construction on the Project site will comply with EGMC development standards for land grading and erosion control (Chapter 16.44}, tree protection (Chapter 19.12}, Swainson's hawk surveys and possible mitigation (Chapter 16.130), and pre-construction surveys as defined by the General Plan EIR. Additionally, any new home construction resulting from the Project will be required to comply with the City's Climate Action Plan (CAP) measures for new sing le-family construction including: BE-4. Building Stock: Encourage or Require Green Building Practices in New Construction, BE-5. Building Stock: Phase in Zero Net Energy Standards in New Construction, TACM-8. Tier 4 Final Construction Equipment TACM-9. EV Charging Requirements. Compliance with these standards has been included in the conditions of approval for the Project. In February 2019, the City Council adopted a new General Plan which relies on Vehicle Miles Traveled (VMT) as a measure of transportation impacts. Pursuant the General Plan's Transportation Analysis Guidelines, projects such resulting in less than 10 dwelling units are exempt. As the Project is proposing a four-lot TPM with a remainder parcel, the maximum number of dwelling units the subdivision could result in would be five, therefore the Project proposal is below the threshold for requiring further VMT analysis.