Nojoqui Creek Barrier Replacement (Lake or Streambed Alteration Agreement No. 1600-2019-0218- R5)
Summary
SCH Number
2020030239
Lead Agency
California Department of Transportation, District 5
(DOT)
Document Title
Nojoqui Creek Barrier Replacement (Lake or Streambed Alteration Agreement No. 1600-2019-0218- R5)
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2020
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0218-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, California Department of Transportation (District 5). The project consists of replacing existing bridge rails with Type 85 concrete barriers and widening the two spans to current shoulder standards, which includes construction of six columns and footings to support the widened structures on the outside edge. Existing rock slope protection, present along the south bank of the creek, will be removed and replaced, adding an additional 190 sq. ft. of permanent impacts.
Contact Information
Name
Baron Barrera
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
California Department of Transportation
Contact Types
Project Applicant
Location
Counties
Santa Barbara
Other Location Info
The project is located just south of the Santa Rosa exit on State Route 101 , south of the City of Buellton. The two bridge spans are located over Nojoqui Creek. The project can be located using the following information: Latitude 34.5965, Longitude -120.19387.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No