Linda Manor Septic to Sewer Conversion Project
2 Documents in Project
Summary
SCH Number
2020029084
Lead Agency
Sacramento County
Document Title
Linda Manor Septic to Sewer Conversion Project
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2020
Document Description
The project would abandon failing private septic systems and connect 57 single-family residences to public sewer facilities. The project includes approximately 4,800 feet of new 8-inch gravity sewer collector to be constructed within county right-of-way along Elkhorn Boulevard, West 2nd Street, Chisum Avenue, Willis Avenue, and Magdelina Street. The proposed alignment would also require an easement along the southern boundary line of a property located at 6133 West 2nd Street to direct flows from the Linda Manor community towards West 2nd Street. Sewer flows from the community would be conveyed north to Sacramento Regional County Sanitation District’s (Regional Sanitation) 66-inch sewer interceptor located beneath West Elkhorn Boulevard, which would then direct flows to Regional Sanitation’s Sacramento Regional Wastewater Treatment Plant (SRTWP). Vertical area of potential effect (APE) for ranges from 5 – 32 feet in depth. The proposed gravity sewer line will be located at a depth of 5 – 7 feet throughout the project area except at the connection point to the Regional Sanitation interceptor located beneath W. Elkhorn Boulevard. Excavation at the interceptor is estimated to be 32 feet deep in order to establish a connection and would likely be accessed via a manhole.
Contact Information
Name
Tim Hawkins
Agency Name
Sacramento county planning
Contact Types
Lead/Public Agency
Phone
Email
Name
Agency Name
Sacramento Area Sewer District (SASD)
Contact Types
Project Applicant
Location
Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
Various
Notice of Determination
Approving Agency
County OF Sacramento
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No