Initial Study Application No. 7594
2 Documents in Project
Summary
SCH Number
2020029045
Lead Agency
Fresno County
Document Title
Initial Study Application No. 7594
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2020
Document Description
The proposed two-lane bridge would be an approximately 145-foot-long, three-span, cast-in-place, concrete slab bridge located downstream of the existing bridge. The proposed bridge will have curb-to-curb width of approximately 32 feet, while the existing bridge only has a clear width of 16.4 feet. This would increase lane widths from 8.2 feet to 12 feet. Construction of the proposed bridge would also add 4-foot wide shoulder in each direction, where the existing bridge has none. No new lanes will be added as part of this project. The total width of the proposed bridge deck would be 34.96 feet.
Contact Information
Name
Chrissy Monfette
Agency Name
Fresno County
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Fresno County
Contact Types
Project Applicant
Location
Counties
Fresno
Other Location Info
The existing bridge (Bridge No. 42C0289) is located on North Frankwood Avenue at its intersection with the Alta Canal; approximately 1.15 miles south of Piedra Road and 1.7 miles north of State Route 180. The replacement bridge will be constructed just south of the existing structure. County of Fresno.
Notice of Determination
Approving Agency
Fresno County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No