San Quentin Pump Station Replacement Project
2 Documents in Project
Summary
SCH Number
2019119034
Lead Agency
City of San Rafael
Document Title
San Quentin Pump Station Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Water District-Water Overlay District / Conservation
Document Description
Project plans involve replacement of the deteriorated San Quentin Pump Station, demolition of the existing station, and improvements to the outfall pipe that extends from the pump station to San Rafael Bay. Development of the new pump station requires removal of existing corrugated metal pipe, riprap rock, base rock, and asphalt and concrete pavement directly to the south of the existing station. This would be followed by installation of a concrete slab to be placed partially over the area of removed rock and concrete adjacent to the existing station. Once the new pump station is operational, the existing station would be removed and disposed of. The deteriorated outfall pipe would then be improved mainly via slip lining. Construction of the proposed project would last for approximately 33 weeks. All improvements would be made within the existing City right-of-way and staging would occur on-site.
Contact Information
Name
Theo Sanchez
Agency Name
City of San Rafael Dept. of Public Works
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
City of San Rafael Public Works
Contact Types
Project Applicant
Location
Coordinates
Cities
San Rafael
Counties
Marin
Cross Streets
Shoreline Parkway and Francisco Blvd East
Zip
94901
Total Acres
3.78
Parcel #
009-010-25
Schools
Bahia Vista Elementary School
Waterways
San Rafael Bay, San Rafael Creek, Corte Madera Creek
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Storm water pump station)
Local Actions
City Council Approval of Final Design
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire