Proposed RCRA Corrective Action Remedy Selection for the Chemtrade Bay Point Facility
2 Documents in Project
Summary
SCH Number
2019109061
Lead Agency
Department of Toxic Substances Control
Document Title
Proposed RCRA Corrective Action Remedy Selection for the Chemtrade Bay Point Facility
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2020
Present Land Use
The General Plan designates the land use of the Proposed Project Site as Heavy Industrial and designates the adjacent areas as Open Space.
Document Description
The California Department of Toxic Substances Control (DTSC) has drafted a Resource Conservation Recovery Act (RCRA) Corrective Action Statement of Basis for the Chemtrade West US LLC (Chemtrade) Bay Point Facility site (Site) in Bay Point, California, pursuant to Health & Safety Code, Division 20, Chapter 6.5. The 26 acre Facility is predominately comprised of three areas of concerns (AOCs) and the Chemtrade Near Bay Area (NBA) are described below:
• AOC-1: the main (operations) portion of the Facility.
• AOC-2: the former wastewater treatment lagoon.
• AOC-3: the former caustic storage area.
• Chemtrade-NBA: undeveloped 0.35-acre tidal wetland adjacent to Suisun Bay.
See NOD for full details.
Contact Information
Name
Nancy Tu
Agency Name
California Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Email
Name
Agency Name
Chemtrade West US LLC
Contact Types
Project Applicant
Location
Coordinates
Cities
Bay Point
Counties
Contra Costa
Cross Streets
Terminus of Nichols Road
Zip
94565
Total Acres
22
Parcel #
099-030-031, 099-030-033, 099-030-034, and 099-030-035
State Highways
4
Railways
UP and BNSF
Schools
Rio Vista Elementary School, Riverview Middle School
Waterways
Suisun Bay
Township
2N
Range
1W
Section
4
Notice of Determination
Approving Agency
California Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes