North 16th Street Streetscape Project

2 Documents in Project

Summary

SCH Number
2019059019
Lead Agency
City of Sacramento
Document Title
North 16th Street Streetscape Project
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2020
Present Land Use
Public Right-of-Way
Document Description
The Project consists of improvements to pedestrian and bicycle circulation along 16th Street and North 16th Street from H Street to Richards Boulevard, as well as improvements to overall streetscape visual quality. This would include improvements to sidewalks, curbs, drainage features, safety-related design features, bicycle connectivity, and landscaping. Key aspects of the project include the following: Installing new curb, gutter, and sidewalk along the corridor; Potential pavement modifications to accommodate proposed vertical curb and sidewalk; Installing drainage improvements along the roadway corridor, including Low Impact Development (LID) features such as planters and swales; Installing consistently spaced street trees; Re-striping to accommodate on-street parking where feasible and appropriate; Installation of LED pedestrian-scale lighting and ‘smart’ poles; Widen sidewalk approach at existing pedestrian tunnels at the 16th Street underpass, Improve lighting within the 16th Street underpass pedestrian tunnels, implement vandal resistant treatments; and Improve bicycle connectivity to the River District.

Contact Information

Name
Qasid Mehirdel
Agency Name
City of Sacramento Department of Public Works
Contact Types
Lead/Public Agency

Name
Agency Name
City of Sacramento
Contact Types
Project Applicant

Location

Cities
Sacramento
Counties
Sacramento
Regions
Citywide
Cross Streets
North 16 Street between H Street and Richards Boulevard
Zip
95814

Notice of Determination

Approving Agency
Sacramento City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes