Cosumnes River Bridge Replacement (Streambed Alteration Agreement No. 1600-2019-R2)

8 Documents in Project

Summary

SCH Number
2019039070
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
Cosumnes River Bridge Replacement (Streambed Alteration Agreement No. 1600-2019-R2)
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Stream bed Alteration Agreement No. 1600-2019-0158-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Granite Construction Company, as represented by George Delano. The project includes bridge and highway improvements on State Route 99 (SR 99). The scope of work will include removing and replacing the existing bridge structures crossing the Cosumnes River, and other activities including replacement of the Cosumnes River Overflow Bridge, improving the Dillard Road Overcrossing, relinquishing the McConnell Underpass, replacing the McConnell Overhead structure, and realigning the southbound lanes of SR 99. Project activities subject to Notification include installation of a temporary bridge, replacement of the Cosumnes River Bridge, and associated installation of a temporary work pad within the Cosumnes River

Contact Information

Name
Dylan Wood
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
California Department of Transportation
Contact Types
Project Applicant

Location

Counties
Sacramento
Other Location Info
The project is located at the Cosumnes River, in the County of Sacramento, State of California; Latitude 38.357836 Longitude -121.343594, Section 20, Township 6N, Range 6E, U.S. Geological Survey (USGS) map Galt, approximately 1.5 miles south of Elk Grove along State Route 99 (SR 99); Assessor's Parcel Number 134-0280-051-00-00, 134-0260-016-0000, and 134-0260-150-000

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print