Butte City Bridge Replacement (Streambed Alteration Agreement No. 1600-2020-0209- R2)
4 Documents in Project
Summary
SCH Number
2019039046
Lead Agency
California Department of Transportation, District 3
(DOT)
Document Title
Butte City Bridge Replacement (Streambed Alteration Agreement No. 1600-2020-0209- R2)
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2021
Document Description
The Project is limited to the
replacement of the existing bridge across the Sacramento River (PM 77.3 to 77.6) and the replacement
of the existing viaduct across the Sacramento River floodplain (PM 76.7 to 77.45). Excavation, backfill,
grading, vegetation removal, concrete work, dewatering, and in-water pile driving will be completed.
Contact Information
Name
Rajpreet Bihala
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Location
Counties
Glenn
Regions
Northern California
State Highways
State Route 162
Waterways
Sacramento River and Rasor Slough
Other Location Info
post miles GLE-162
76.7 - 77.6
Notice of Determination
Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Glenn
Final Environmental Document Available at
available to the general public at the office location listed above for the Lead Agency. CDFW’s record of Project
approval as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No